Excavation Complete The excavation phase of the construction of the hotel is complete. Over 21,000 cubic metres of rock and soil have been removed from an area measuring 6,400 square metres (about one and a third football pitches) to accommodate the basement and lower ground floors. The excavation phase was slowed down by the three […]