Hilton Freetown Cape Sierra Hotel Newsletter – Issue 8.2

Thanks for visiting our website. We now invite you to read our current Newsletter filled with our latest developments and future plans. Please click on this link to read further Hilton Freetown Cape Sierra Hotel Issue 8.2

Leave a comment Continue Reading →

October 2016 Newsletter

Welcome to our October Newsletter filled with our latest developments and future plans. Please click on this link to read further hilton-freetown-cape-sierra-hotel-newsletter-issue-7-october-2016

Leave a comment Continue Reading →

March 2016 Newsletter

The construction of the Hilton Freetown Cape Sierra  Hotel  has accelerated The structural frame of four out of the eleven floors of the Tower (West) Block   have     been     completed.   Work   is also progressing on the first two  floors   of    the   Low     (East)   Block. Please click here to read more about our exciting developments Issue 6 […]

1 Comment Continue Reading →

Hilton Freetown Cape Sierra Hotel – Project Newsletter – Issue 5 September 2015 – Excavation Completed; Main Structure Going Up

Excavation Complete The excavation phase of the construction of the hotel is complete. Over 21,000 cubic metres of rock and soil have been removed from an area measuring 6,400 square metres (about one and a third football pitches) to accommodate the basement and lower ground floors. The excavation phase was slowed down by the three […]

Leave a comment Continue Reading →

Cape Sierra Hilton goes 2 floors deep – Article from Sierra Leone News

Construction work at the new Hilton Freetown Cape Sierra hotel is going on in earnest as the contractors fight to beat the odds against them. Coming in from constructing the massive Gambian House of Assembly Bhupinder Jit Singh the Project head of the Indian Construction firm Shapoorji Pallonji says “I am still not panicking” whilst […]

Leave a comment Continue Reading →

Hilton Freetown Cape Sierra Hotel – Issue 4

From Mobilisation to Excavation Work on the construction of the five-star, 200-room Hilton Freetown Cape Sierra Hotel continues at the Aberdeen site. In November 2014 the construction moved from the Mobilisation Phase to Excavation, the first stage of the actual hotel construction.   The Hotel When completed Hilton Freetown Cape Sierra Hotel will be the […]

Leave a comment Continue Reading →

Senior FBN Bank Official Visits Hilton Freetown Cape Sierra Hotel Project

Mr Maxime Senecaut, a senior official of FBN Bank (UK) arrived in Freetown on Sunday 28th April for a short visit to the Hilton Freetown Cape Sierra Hotel project. FBN Bank (UK) and Afreximbank are the senior lenders to the project with FBN Bank (UK) being the principal lender during the construction phase of the […]

Leave a comment Continue Reading →

Hilton Freetown Cape Sierra Hotel – Project Newsletter 3: Design of Hilton Freetown Cape Sierra Hotel Approved; Construction to start 2013

After months of detailed  work the Scheme Design of the 200-key first class Hilton Freetown Cape Sierra Hotel has been signed off by Hilton Worldwide, making way for the commencement of construction.  This  is  a very important step because under the agreement with Hilton, construction of the hotel cannot start until the formal approval of […]

1 Comment Continue Reading →

Hilton Freetown Cape Sierra Hotel featured as Afreximbank awarded best ECA Africa

On Thursday 21st June 2012, Afreximbank was awarded Best ECA (Export Credit Agency) Africa at the 2011 Trade Finance Awards Dinner that was held at the Sheraton Park Lane Hotel in London.  Afreximbank’s financing of the Hilton Freetown Cape Sierra Hotel using its Contour Africa Facility was listed as one of a number of programmes and […]

Leave a comment Continue Reading →

Hilton Freetown Cape Sierra Hotel – Project Newsletter Issue 2: Site Investigations and Surveys Completed

Design of the Hilton Freetown Cape Sierra Hotel Accelerates – The design of the 200-key first class Hilton Freetown Cape Sierra continues to make good progress with activities both on the ground at the Aberdeen site and also by the international design team in London Site Investigations and Surveys Completed One of the most important […]

Leave a comment Continue Reading →